Medicaid Provider Spending

$1.09 trillion in Medicaid claims data, 2018–2024 · 617K+ providers

JJL&W INC. T/A KOMFORT & KARE

NPI: 1396778429 · MAGNOLIA, NJ 08049 · Prosthetic/Orthotic Supplier · NPI assigned 07/09/2006

$398K
Total Medicaid Paid
2,879
Total Claims
2,073
Beneficiaries
10
Codes Billed
2020-12
First Month
2024-11
Last Month

Provider Details

Authorized OfficialAUERBACH, SETH (PRESIDENT)
NPI Enumeration Date07/09/2006

Monthly Spending Trend

Yearly Breakdown

YearClaimsTotal Paid
2020 17 $2K
2021 769 $95K
2022 794 $111K
2023 697 $98K
2024 602 $91K

Billing Codes

CodeDescriptionClaimsBeneficiariesTotal Paid
L3020 Foot, insert, removable, molded to patient model, longitudinal/ metatarsal support, each 1,564 1,003 $205K
L4360 Walking boot, pneumatic and/or vacuum, with or without joints, with or without interface material, prefabricated item that has been trimmed, bent, molded, assembled, or otherwise customized to fit a specific patient by an individual with expertise 656 633 $96K
L1971 Ankle foot orthosis, plastic or other material with ankle joint, with or without dorsiflexion assist, prefabricated, includes fitting and adjustment 344 228 $70K
L1960 Ankle foot orthosis, posterior solid ankle, plastic, custom fabricated 46 30 $10K
L2275 Addition to lower extremity, varus/valgus correction, plastic modification, padded/lined 97 68 $4K
A5500 For diabetics only, fitting (including follow-up), custom preparation and supply of off-the-shelf depth-inlay shoe manufactured to accommodate multi-density insert(s), per shoe 74 45 $4K
L2330 Addition to lower extremity, lacer molded to patient model, for custom fabricated orthosis only 24 12 $3K
L2280 Addition to lower extremity, molded inner boot 25 12 $3K
L2820 Addition to lower extremity orthosis, soft interface for molded plastic, below knee section 36 29 $1K
A5512 For diabetics only, multiple density insert, direct formed, molded to foot after external heat source of 230 degrees fahrenheit or higher, total contact with patient's foot, including arch, base layer minimum of 1/4 inch material of shore a 35 durometer or 3/16 inch material of shore a 40 durometer (or higher), prefabricated, each 13 13 $540.46